Farm + Industrial Antiques and Collectibles Old belt driven farm equipment: shellers, milkers, threshers, pumps and antiquities of the industrial revolution.

Farm + Industrial Antiques and Collectibles

Iron Sides 2 hole portable sheller project


this thread has 45 replies and has been viewed 3704 times

Reply
 
Thread Tools Display Modes
  #21  
Old 12-13-2016, 08:56:02 AM
DieselAddicted DieselAddicted is offline
Subscriber
 
Join Date: Sep 2010
Location: Mount Vernon, Ohio
Posts: 692
Thanks: 108
Thanked 751 Times in 318 Posts
Default Re: Iron Sides 2 hole portable sheller project

Thanks for the tips, I wiped a coat of dark walnut stain on it. It is actually darker and closer to what it needs to be than the picture shows.

The elevator is getting closer, both cosmetically and mechanically.
Reply With Quote
The Following 3 Users Say Thank You to DieselAddicted For This Post:
Sponsored Links
  #22  
Old 12-14-2016, 09:25:39 AM
DieselAddicted DieselAddicted is offline
Subscriber
 
Join Date: Sep 2010
Location: Mount Vernon, Ohio
Posts: 692
Thanks: 108
Thanked 751 Times in 318 Posts
Default Re: Iron Sides 2 hole portable sheller project

This is the door that allows access to the chain adjusters. I thought the little castings that serve as corner braces and the latches were neat. Not sure why the expense? Maybe how they trained apprentices in the pattern shops??


And installed

Reply With Quote
The Following 4 Users Say Thank You to DieselAddicted For This Post:
  #23  
Old 12-16-2016, 08:15:21 AM
DieselAddicted DieselAddicted is offline
Subscriber
 
Join Date: Sep 2010
Location: Mount Vernon, Ohio
Posts: 692
Thanks: 108
Thanked 751 Times in 318 Posts
Default Re: Iron Sides 2 hole portable sheller project

I hope this is remaining interesting, I do struggle with how much detail and how-to to include vs just showing basic progress.

This is the feed opening into the sheller. The top and bottom rollers with the flaps? direct the ears to the shelling chamber while the lower opening or chute is where some portion of the pre-shelled kernels drop and go on to the shelled corn elevator. The rest of the kernels that somehow travel back with the chain end up on the wood chute I repaired earlier and on the ground, or into a bucket


This casting attaches to the floor of the feed elevator at the top end and is the heart of the feeding process. The ears and shelled kernels travel on it towards the forked end. The drive sprocket is also between the forks and the chain passes through it. The kernels drop through at the fork and the little chute underneath directs them past the return side of the chain to the chute below. The ears travel on to the end and are guided into the shelling chamber.
This is the underside


And the top


Ok why all the detail you might ask? Because one of those castings is missing and the machine will not work with out it. If in my wildest dreams I thought that anyone else would ever need one I would have some cast. That not being the case I am going to fabricate one from steel. Found the 2x 1/2" channel at TSC which seems like a good starting point and scrounged around under the welding table for the remainder.
Reply With Quote
The Following 3 Users Say Thank You to DieselAddicted For This Post:
  #24  
Old 12-16-2016, 11:49:54 AM
jimbo8259 jimbo8259 is offline
Registered
 
Join Date: May 2013
Location: Princeton wisconsin
Posts: 14
Thanks: 10
Thanked 12 Times in 7 Posts
Default Re: Iron Sides 2 hole portable sheller project

Nice project so far, can't wait to see it finished. Not to change subject but I have been looking at a grizzly planer like what was in your earlier post,how has that been working for you?
Reply With Quote
  #25  
Old 12-16-2016, 12:55:17 PM
Jebaroni's Avatar
Jebaroni Jebaroni is offline
Registered-III
 
Join Date: Jan 2005
Location: Greenville NC USA
Posts: 2,026
Thanks: 183
Thanked 629 Times in 460 Posts
Default Re: Iron Sides 2 hole portable sheller project

I, for one, appreciate more detail as opposed to less. Lots of pictures, lots of discussion....right on! Plus, the added information could help someone else later on down the road. That thing is looking great! Be sure to post video of it running once all this hard work is over with!
Reply With Quote
  #26  
Old 12-16-2016, 01:33:21 PM
DieselAddicted DieselAddicted is offline
Subscriber
 
Join Date: Sep 2010
Location: Mount Vernon, Ohio
Posts: 692
Thanks: 108
Thanked 751 Times in 318 Posts
Default Re: Iron Sides 2 hole portable sheller project

Hi,
I am a woodworker wannabe so take all I have to say with a grain of salt.
Before the Powermatic and Grizz machines I had a Dewalt planer and a Porter Cable jointer from the big box store and neither was up the work of 6-8 foot pieces of rough sawed Oak plunked on or in them plus the wood always has enough dirt and debri attached to make blade life pretty short. When I upgraded to the 15" Powermatic planer and 8" long bed Grizz jointer I also upgraded to the carbide inserted spiral cutter heads on both machines. As compared to what I had before both are Cadillacs. Neither machine required any tweaking to get the finished product to my admittedly soft standards. I will say that any amount of extra money spent for the upgrading the heads to spiral inserted carbide will be forgotten as soon as the first piece of wood hits the machine, they are really that good. Two complaints on them are the mobile base on the Grizz jointer is not even close to what Powermatic puts under their machines. Also both machines are 220 but came pre wired with 3 wire cords and I am like REALLY??? That all was removed and we now have 4 wires and a dedicated ground instead of relying on the neutral .
Reply With Quote
The Following User Says Thank You to DieselAddicted For This Post:
  #27  
Old 12-17-2016, 06:31:41 PM
DieselAddicted DieselAddicted is offline
Subscriber
 
Join Date: Sep 2010
Location: Mount Vernon, Ohio
Posts: 692
Thanks: 108
Thanked 751 Times in 318 Posts
Default Re: Iron Sides 2 hole portable sheller project

I am quite a bit more comfortable with iron instead of wood but still spent a couple evenings on this .
Laying the first parts out for tacking


The basics


Quick jig for bending


First bends
Reply With Quote
The Following 2 Users Say Thank You to DieselAddicted For This Post:
  #28  
Old 12-17-2016, 06:38:35 PM
DieselAddicted DieselAddicted is offline
Subscriber
 
Join Date: Sep 2010
Location: Mount Vernon, Ohio
Posts: 692
Thanks: 108
Thanked 751 Times in 318 Posts
Default Re: Iron Sides 2 hole portable sheller project

2nd bends


Some more welding


More welding, grind some, weld a bit more, then grind


Needed some small keystock for the corners of the trough, otherwise we are calling it done.

Reply With Quote
The Following 3 Users Say Thank You to DieselAddicted For This Post:
  #29  
Old 12-18-2016, 10:02:36 PM
DieselAddicted DieselAddicted is offline
Subscriber
 
Join Date: Sep 2010
Location: Mount Vernon, Ohio
Posts: 692
Thanks: 108
Thanked 751 Times in 318 Posts
Default Re: Iron Sides 2 hole portable sheller project

Hung the feeder today. I added a hopper extension since we will be feeding it with a scoop shovel. The color on the new pieces is darkening as it ages. A little barn dust and a few bruises here and there it should look right at home?


The mount, I got to run the wood lathe a little bit


The original and fabbed feeder pieces, figured it would be easier to mount the feeder and then attach them where they need to be instead of measuring and crossing my fingers that they fit.


Last edited by DieselAddicted; 12-19-2016 at 09:09:36 AM.
Reply With Quote
The Following 3 Users Say Thank You to DieselAddicted For This Post:
  #30  
Old 12-18-2016, 10:14:59 PM
Paul Searl's Avatar
Paul Searl Paul Searl is offline
Subscriber
 
Join Date: Aug 2010
Location: Stockton, Illinois
Posts: 1,081
Thanks: 1,558
Thanked 3,763 Times in 745 Posts
Default Re: Iron Sides 2 hole portable sheller project

thanks again for posting all this, certainly we are getting some ideas on how to do ours.
Reply With Quote
Reply


Thread Tools
Display Modes

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

F o r u m Jump

Similar Threads Chosen at Random
Thread Thread Starter F o r u m Replies Last Post
IH Two Hole Sheller Project Tim Colwell Farm + Industrial Antiques and Collectibles 10 03-23-2017 08:33:16 PM
Two Hole Sheller with Bagger Scott Hartz Farm + Industrial Antiques and Collectibles 5 10-19-2016 08:26:07 AM
4-hole Corn Sheller Chuck H Farm + Industrial Antiques and Collectibles 1 08-07-2011 07:37:39 AM
8 hole Sandwich Sheller Dave Thompson Farm + Industrial Antiques and Collectibles 5 07-16-2009 10:24:48 PM
2 hole Sandwich Sheller Bob Ronning Antique Engine Archives 0 11-12-2004 08:16:35 PM


Use "Ctrl" mouse wheel to change screen size.
All times are GMT -4. The time now is 01:29:31 AM.

Smokstak and Enginads site search!


All use is subject to our TERMS OF SERVICE
SMOKSTAK® is a Registered Trade Mark - A Community of Antique Engine Enthusiasts
Copyright © 2000 - 2016 by Harry Matthews P.O. Box 5612 - Sarasota, FL 34277